Back to Blog
AI Risk Register: How to Identify, Score, and Track AI-Specific Risks
Risk Management·8 min read·

AI Risk Register: How to Identify, Score, and Track AI-Specific Risks

C

Claw GRC Team

Claw GRC Team

Build a comprehensive AI risk register covering model failures, data poisoning, agent autonomy risks, regulatory exposure, and vendor concentration. Includes CVSS-inspired AI risk scoring methodology and treatment templates.

AI Risk Register: How to Identify, Score, and Track AI-Specific Risks

A risk register is the backbone of any GRC program. But traditional IT risk registers weren't designed for AI systems — they don't capture model drift, agent autonomy risks, prompt injection, or training data poisoning.

This guide covers how to build an AI-specific risk register, how to score AI risks consistently, and how to track treatment through remediation.

Why AI Risks Are Different

Traditional IT risks are largely deterministic: a firewall misconfiguration either allows traffic or it doesn't. AI risks include probabilistic and emergent dimensions:

  • Model failure modes: The model might work 98% of the time but fail on specific inputs in ways that are difficult to predict
  • Data dependency: The model's behavior depends on training data that may have been corrupted, biased, or become stale
  • Emergent behavior: AI agents operating autonomously may develop patterns of behavior not anticipated in design
  • Cascading failures: In multi-agent systems, one agent's poor decision propagates to downstream agents
  • Regulatory exposure: AI-specific regulations (EU AI Act, NY Local Law 144, etc.) create compliance risk distinct from technical risk

The 7 Categories of AI Risk

1. Model Performance Risk

Risks related to the AI model itself degrading or failing:

Risk Description Likelihood Impact
Model drift Production data distribution shifts, model accuracy degrades High High
Edge case failure Model fails on valid inputs outside training distribution Medium High
Hallucination (factual) Model confidently produces incorrect facts High Medium-High
Hallucination (action) Agent takes incorrect action based on hallucinated reasoning Medium Critical
Capability regression Model update degrades specific capabilities Low High

2. Data Risk

Risks related to training data, inference data, and data pipelines:

Risk Description Likelihood Impact
Training data poisoning Adversary corrupts training data to manipulate model behavior Low Critical
Data leakage Training data (including PII/PHI) exposed via model outputs Low Critical
Stale training data Model knowledge cutoff creates decisions based on outdated information High Medium
Data pipeline compromise Upstream data source corrupted, feeding bad data to model Low High
Consent/license violation Training data used without required consent or license Low High

3. Security Risk

Risks from adversarial attacks on AI systems:

Risk Description Likelihood Impact
Prompt injection Malicious input overrides AI instructions High High
Indirect prompt injection Malicious content in AI-retrieved documents overrides instructions High High
Model inversion Attacker extracts training data from model Low Critical
Adversarial examples Crafted inputs cause model misclassification Medium Medium
Jailbreaking Input sequence bypasses safety guardrails High Medium-High
Model theft Attacker replicates proprietary model via API queries Low High

4. Operational Risk

Risks related to AI system operations and reliability:

Risk Description Likelihood Impact
API rate limiting AI vendor rate limits cause application failures Medium Medium
AI vendor outage Dependency on third-party AI API causes downtime Medium High
Cost overrun Uncontrolled AI inference costs exceed budget Medium Medium
Context window overflow Agent context exceeds model limits, causes errors High Medium
Runaway agent Agent executes unintended actions in autonomous operation Low Critical

5. Compliance and Regulatory Risk

Risks from AI-specific regulations:

Risk Description Likelihood Impact
EU AI Act violation Prohibited practice or high-risk use without compliance Medium Critical
Discriminatory output AI model produces discriminatory decisions (lending, hiring, etc.) Medium Critical
NY LL144 violation AI hiring tool without bias audit High (if in-scope) High
GDPR right to explanation No mechanism to explain AI-based automated decisions Medium High
Copyright violation AI generates content that infringes training data copyright Medium High

6. Vendor and Concentration Risk

Risks from AI vendor dependencies:

Risk Description Likelihood Impact
Vendor price increase AI vendor dramatically increases API pricing Medium Medium
Model deprecation AI vendor deprecates model used in production High High
Vendor lock-in Switching AI vendors requires significant re-engineering High Medium
Vendor acquisition AI vendor acquired, terms changed Low Medium
Vendor policy change AI vendor implements usage restrictions Medium Medium

7. Governance Risk

Risks related to AI oversight and accountability:

Risk Description Likelihood Impact
Accountability gap AI decision affects person with no human accountable High High
Audit trail gap AI agent actions not logged, unable to reconstruct decisions High High
Shadow AI Employees using unauthorized AI tools with company data High High
Model access abuse Authorized users misuse AI access for prohibited purposes Medium High
Governance bypass Agents granted excessive autonomy without approval Medium High

AI Risk Scoring Methodology

Traditional CVSS-style scoring doesn't map well to AI risks. We recommend a modified scoring approach:

AIRSS (AI Risk Scoring System)

Base Score Factors:

  1. Attack Vector (AV):

    • Network: 1.0 (exploitable over network)
    • Adjacent: 0.7 (exploitable via prompt/data injection)
    • Local: 0.4 (requires local access)
    • Physical: 0.2
  2. Autonomy Level (AL):

    • Fully Autonomous: 1.0 (agent acts without human approval)
    • Semi-Autonomous: 0.7 (human review before critical actions)
    • Human-Assisted: 0.4 (human triggers all actions)
    • Advisory Only: 0.2
  3. Data Sensitivity (DS):

    • PII/PHI/Financial: 1.0
    • Internal Confidential: 0.7
    • Internal: 0.4
    • Public: 0.1
  4. Impact (I):

    • Critical Business Process: 1.0
    • Significant Process: 0.7
    • Minor Process: 0.4
    • Negligible: 0.1
  5. Reversibility (R):

    • Irreversible (data deleted, funds transferred): 1.0
    • Difficult to reverse: 0.7
    • Easily reversible: 0.3

AIRSS Score = (AV + AL + DS + I + R) / 5 × 10

Score ranges:

  • 8.0-10.0: Critical — immediate remediation required
  • 6.0-7.9: High — remediate within 30 days
  • 4.0-5.9: Medium — remediate within 90 days
  • 2.0-3.9: Low — monitor, remediate within 180 days
  • 0-1.9: Informational — document and accept

Example Scoring

Risk: "Runaway agent executes irreversible financial transactions"

  • AV: Network (1.0) — triggered via API
  • AL: Fully Autonomous (1.0) — no human approval
  • DS: Financial (1.0) — payment system
  • I: Critical (1.0) — core payment processing
  • R: Irreversible (1.0) — funds transferred

AIRSS = (1.0 + 1.0 + 1.0 + 1.0 + 1.0) / 5 × 10 = 10.0 — Critical

Recommended control: Implement dual-approval workflow for all transactions over $X; human approval required before execution.

Risk Treatment Options

Accept

Document the risk, assign an owner, and formally accept it. Appropriate for low-likelihood/low-impact risks where controls cost more than the risk.

Required: Risk acceptance sign-off from appropriate authority level (based on risk score).

Mitigate

Implement controls to reduce likelihood, impact, or both.

Common AI risk mitigations:

  • Prompt injection: Input validation, output filtering, sandboxed execution
  • Model drift: Automated performance monitoring, drift detection alerts
  • Runaway agent: Rate limiting, action approval gates, circuit breakers
  • Hallucination: Output validation, human-in-the-loop for high-stakes decisions
  • Vendor lock-in: Multi-provider architecture, model abstraction layer

Transfer

Transfer the risk to a third party.

  • Cyber insurance covering AI-related incidents
  • Vendor liability clauses in AI vendor contracts
  • Requiring AI vendors to carry E&O insurance

Avoid

Eliminate the risk by not doing the risky activity.

  • Don't use AI for specific high-risk decisions (e.g., unsupervised clinical decisions)
  • Don't allow AI agents to access production databases directly
  • Don't use AI systems that lack audit logging capabilities

Risk Register Template

## Risk: [Risk ID] — [Risk Name]

**Category**: [Model / Data / Security / Operational / Compliance / Vendor / Governance]
**Registered**: [Date]
**Owner**: [Name / Team]

### Description
[Clear description of the risk, including triggering conditions and failure modes]

### AIRSS Scoring
- Attack Vector: [AV]
- Autonomy Level: [AL]  
- Data Sensitivity: [DS]
- Impact: [I]
- Reversibility: [R]
**AIRSS Score**: [X.X] ([Critical/High/Medium/Low])

### Inherent Risk
[Risk before any controls]

### Current Controls
- [Control 1]: [Description]
- [Control 2]: [Description]

### Residual Risk
[Risk after current controls]

### Treatment Plan
**Decision**: [Accept / Mitigate / Transfer / Avoid]
**Planned Controls**:
- [ ] [Control A] — Owner: [Name] — Due: [Date]
- [ ] [Control B] — Owner: [Name] — Due: [Date]

### Review Schedule
- **Next Review**: [Date]
- **Trigger Review If**: [Conditions that should trigger re-evaluation]

Building Your Risk Register in Claw GRC

Claw GRC's risk register includes:

  • Pre-populated AI risk templates for all 7 categories
  • AIRSS scoring calculator
  • Treatment workflow with owner assignment and due dates
  • Automatic risk review scheduling
  • Integration with findings (security findings auto-escalate to risk register)
  • Agent trust score factored into agent-related risks (lower trust = higher risk score)

Open your AI risk register →

CG

Get started with Claw GRC

AI-native compliance automation. 1,026+ controls. MCP-native. Free workspace, no credit card.

Start Free →